Tampilkan postingan dengan label SFMTA. Tampilkan semua postingan
Tampilkan postingan dengan label SFMTA. Tampilkan semua postingan

Rabu, 24 Mei 2023

June 10 Muni Service Changes Adds Service on Connector Routes

June 10 Muni Service Changes Adds Service on Connector Routes
By Clive Tsuma

A bus parked on the side of a road with one person exiting with a cart and another person exiting while holding bags

The 38R Geary Rapid will run every 6 minutes starting June 10

Starting Saturday, June 10, the SFMTA will be adding Muni service on several lines to address crowding, wait times and to support increased summer tourism. We’re also making some stop changes to serve more customers and make the service more accessible and reliable. 

Increased Service 

To address crowding and reduce pass-ups, we’re adding service on the 1 California between Clay and Drumm streets and California Street and Presidio Avenue – where demand is highest – on weekdays from 7 a.m. to 7 p.m. 

We’re also going to be starting service earlier on the 1X California Express, at 7:30 a.m. instead of 8 a.m., in response to customer feedback, as well as adding stops at Cherry, Spruce and Laurel streets and Presidio Avenue.  

We’re also extending the evening service to the Presidio at 30 Stockton seven days a week. The last trip from the Sports Basement will depart at 8:30 p.m. instead of 8 p.m.  

On the 5 Fulton Owl we’re extending the terminal from McAllister and Jones streets to 4th and Market streets, which will provide a connection to Market Street for customers. 

Additionally, to better support summer tourism, we will add supplemental Muni bus service on weekend afternoons for the F Market & Wharves between the Ferry Building and Fisherman’s Wharf from 2 p.m. to 10 p.m. 

Other upcoming changes include frequency increases on the following lines: 

  • 28 19th Avenue – Weekdays and weekends from 10 minutes to 9 minutes during peak morning service and from 12 minutes to 10 minutes during midday  
  • 38R Geary Rapid – Weekdays from 7 minutes to 6 minutes all day 
  • 44 O’Shaughnessy – Weekdays from 12 minutes to 10 minutes 

Stop Changes 

On the 15 Bayview Hunters Point Express, we’re improving access to the shops, banks and supermarket at the Southeast Center by moving the bus stop at 3rd and Evans Street from the far side of the street to the near side of the street.  

On the 27 Bryant, we’re improving accessibility and reliability by upgrading flag stops to bus zones on Leavenworth and Turk, Post, Sutter, Bush and Pine streets, inbound, and on Bush and Leavenworth outbound. And we’re adding inbound and outbound stops at Valencia and 24th streets to restore the connection there for customers. 

Read more about the highest Muni rider satisfaction in 10 years! We continue to prioritize supporting the city’s economic recovery and providing Muni service that we can sustain with our available resources. To give us feedback on Muni service write to TellMuni@SFMTA.com.  

We’re also prioritizing safety on Muni. If you experience or witness customer or operator harassment on Muni, report it directly to the SFMTA by calling 311 or using the 311 mobile app or the Muni Feedback form (SFMTA.com/MuniFeedback). 

Related Content:  

Muni Rider Satisfaction the Highest in 10 Years 

2023 Community Survey Results  

Muni Feedback 

Related Projects: 

Safety Equity Initiative 

2023 Community Survey Results 

2023 Community Survey Data Crosstabs



Published May 23, 2023 at 11:41PM
https://ift.tt/zahbP3S

Jumat, 19 Mei 2023

Bike to Wherever Day

Bike to Wherever Day
By

Join people across the city bicycling today for the annual Bike to Wherever Day. The SFMTA is proud to be the official citywide sponsor of Bike to Wherever Day 2023, San Francisco's favorite biking celebration!   

A bicyclist with a backpack and helmet is seen in the street adjacent to a crosswalk.

Hosted by the San Francisco Bicycle Coalition, Bike to Wherever Day celebrates  bicycles as a fun and healthy way to get around. This annual event invites people to pedal to their destinations, and it promotes bicycling both as an alternative commute and as a healthy and safe alternative to driving to…wherever. 

We encourage everyone, including those who don't usually bike, to get out and cycle today. After grabbing some wheels  (your own or a bikeshare bike), consider joining one of the Neighborhood Rides. Need more reason to stop by? You also can pick up your free Bike to Wherever Day canvas tote bag, filled with goodies, courtesy of the SF Bicycle Coalition. 

Resources to Help You Plan Your Bicycle Trip 

The SFMTA has go-to resources to help you plan your bicycle trips.  The interactive bike network map highlights recommended routes and shows bikeshare station locations. Go to our Get Out, Get Going website  to find an interactive multi-mode map with information about other sustainable ways to get around that you could pair with your bicycle trip, including walking and using shared mobility devices, like a scooter or moped.   

The SFMTA supports low-carbon transportation options like bicycles, and we continue to expand our dedicated bike lanes around the city to make streets safer and more comfortable for bicycling.  

You can check out our Slow Streets Program with over 18 corridors  that have traffic limitations so they can be used as shared spaces with walkers and bicyclists. Biking, scooting and rolling  are integral to our new Active Communities Plan, a 2-year process to develop a plan for active mobility in San Francisco.  For more information, visit the project website (SFMTA.com/ActiveCommunities).  



Published May 19, 2023 at 04:20AM
https://ift.tt/mIa7tub

Rabu, 17 Mei 2023

San Francisco To Extend Parking Meter Hours Citywide

San Francisco To Extend Parking Meter Hours Citywide
By Pamela Johnson

Cars parked along the sidewalk outside with pay station nearby and blue sky above.

Much like real estate, parking is at a premium in San Francisco. For decades, most parking meters in the city have operated from 9:00 a.m. until 6:00 p.m. Monday through Saturday. While drivers generally love free parking, they may not realize that it’s hard to find a space in the evenings and on Sundays in many neighborhoods because the meters are not running. 

Beginning in July 2023 and continuing in phases through December 2024, the SFMTA will extend parking meter hours until 10:00 p.m. Monday through Saturday and add Sunday meter hours from 12:00 p.m. until 6:00 p.m. Parking meters already operate in the evenings or on Sundays in some areas, including Mission Bay, South Beach, the 18th Street business district in Potrero Hill and along the Embarcadero. This extension will make meter hours more consistent citywide, create more parking availability and generate revenue to help the agency sustain vital Muni service. San Francisco has changed considerably since the current parking meter hours were introduced in 1947. Cities locally and around the country run their parking meters in the evenings and on Sundays because these days, many businesses are open then. Since parking spaces tend to turn over more quickly when meters are in operation, extending meter hours can help businesses by making parking more available and therefore allowing drivers to spend less time looking for a space. Fewer drivers circling the block to look for parking means reduced traffic congestion, less air pollution and fewer greenhouse gas emissions. 

Extending meter hours also will help the SFMTA address a potentially catastrophic budget shortfall. The agency anticipates a projected $130 million deficit starting in Fiscal Year 2025 due to COVID-19's ongoing effects. Without additional funding, we could be forced to eliminate as many as 20 Muni lines, which would disproportionately affect those with low incomes, people of color, older adults and people with disabilities.  

Evening and Sunday parking meter hours will be implemented in six phases over a period of 18 months, beginning with Dogpatch and Fisherman’s Wharf. To take into account historic inequities in San Francisco, lower-income neighborhoods whose residents are predominantly people of color will come last in the rollout. We also are in the process of replacing every parking meter in the city. The extended meter hour implementation is designed to follow behind the installation of new meters, which will have bigger, brighter and easier to use screens; operate in English, Spanish and Chinese; and are more resistant to vandalism. 

In the meantime, SFMTA staff will be doing extensive outreach and meeting with merchant groups, religious leaders, neighborhood groups and elected officials to discuss the program.  

We do understand that extending parking meter hours will impact people who drive to religious services on Sundays. However, those drivers likely will only have to pay for parking for a few hours, if at all, because the meters won’t begin operating until noon on Sundays. There also will be no time limits at metered spaces after 6 p.m. or at any time on Sundays, giving drivers the freedom to decide how much time to spend at dinner, a religious service or wherever they might be, without having to feed the meter repeatedly. Plus, thanks to the SFMTA’s Demand Responsive Parking Pricing program, drivers will often find less expensive parking meters just a block or two away from busier corridors.  

To learn more, visit the project website (SFMTA.com/ModernMeterHours).  



Published May 17, 2023 at 04:45AM
https://ift.tt/EMvqDxY

Kamis, 11 Mei 2023

Meet the People of the Next Generation CIS: Leon Yu

Meet the People of the Next Generation CIS: Leon Yu
By Deanna Leo

Headshot of SFMTA staff Leon Yu

Leon Yu, Graphic Artist, Creative Services  

What do you do on the project? 

I help design the user experience: What users see on the new displays, how they see it and how often they see it, down to the actual graphics.  

How do you feel your work impacts our customers? Who will benefit? 

My work communicates transit information to customers as cleanly and clearly as possible, so the information is easy for any member of the public to understand. We only have a small space to work with on the displays, so we must make it count. People  of all backgrounds, languages and abilities, so need to get this information quickly at a glance.  

What was your favorite part of the project? 

My favorite part is working with the team and all the different CIS systems. This is such a multidisciplinary project involving many staff and people I’ve never worked with before. Being able to collaborate with so many dedicated colleagues is rewarding.  

What do you like most about working at the SFMTA? 

As a graphic designer, my work is always on display. Being able to see my work in public and see Muni riders engage with my work to get information that helps them with their trip is exciting and satisfying.  

To learn more about this challenging and important project visit the project home page (SFMTA.com/NextGenCIS).   



Published May 11, 2023 at 02:34AM
https://ift.tt/34PpIgv

Jumat, 05 Mei 2023

Muni Rider Satisfaction the Highest in 10-years!

Muni Rider Satisfaction the Highest in 10-years!
By Bonnie Jean von Krogh

People walking on a station platform. Some are boarding. Some are deboarding.

Here at the SFMTA, we are focused on creating the fastest, safest and most reliable public transportation network for all San Franciscans. This is why we consider it a top priority to hear from our riders and non-riders alike about how we’re doing, what your public transportation priorities are, and ways we can improve. These findings help to inform budget, long-range planning and policy decisions. They also help build a better Muni for everyone traveling in San Francisco. 

In recent months we conducted our Rider Survey as well as a broader Community Survey. Real-time data from our partners at Transit App in their North America Transit Rider Happiness Benchmarking Survey provides additional details about community feedback.  

The good news? Rider satisfaction with Muni services is up across the board: 

  • Per SFMTA’s Rider survey, 66% of Muni riders rate services as good or excellent — a 9% increase from 2021. 
  • The City Survey shows Muni’s rating at its highest level since 2013 
  • Transit App’s survey shows Muni in the Top 5 North American cities when it comes to ranking riders most likely to recommend their public transit system to a friend 
  • Transit App also shows that Muni riders give our drivers the highest overall approval rating across North America. Go, operators! 
  • Finally, the Community Survey showcases that our riders have a much higher approval rating for the SFMTA than non-riders.  

So if you haven’t ridden Muni in a while, maybe it’s time to give it a try.   

A man with a beard, sweater and jeans is smiling at the front of a bus to an operator who is wearing sunglasses seated in their seat.

 Highlights from the Community Survey

  • 71% of riders approve of the SFMTA compared to  48% of non-riders. 
  • 66% of riders rate Muni service as excellent/good compared to 48% of non-riders.   
  • By 9 points, regular riders also consider Muni safer than non-riders 

A bus on the left side of the screen is seen on a corridor with over a dozen cars on the right side of the image

Our Rider Survey shows us that customers have noticed the work Muni has been doing to address service delivery since the onset of the pandemic. Our ongoing investments in reliability improvements such as transit lanes, bus bulbs and smart traffic signals have also paid off. Over the last three years, we implemented over 21 miles of new transit lanes, bringing our transit lane network to more than 70 miles! With this expansion, Muni is quicker and more reliable than it has been in decades. 

That said, there’s more to be done, and respondents continue to emphasize “Improving the speed, frequency and reliability of Muni buses and trains,” with two-thirds of respondents prioritizing, “having the most frequent and reliable buses and trains, even if stops are more than 2 or 3 blocks away, rather than having closer stops.”  

Next Steps 

We asked what our community would most like to see changed, and while answers varied, the top priorities according to the Community Survey are:  

  • Crime/safety (including fare evasion and passenger safety) 
  • More reliable/efficient/on time service/less bunching of busses 
  • Better communication and public outreach 
  • Improved cleanliness of transit stops 
  • Additional funding to create faster, safer and more reliable public transportation  

A person is seen boarding the bus along the curb. There are trees in the foreground on the left of the image.

Safety is a Key Priority 

  • Over 50% of respondents cited “Increasing safety from crime on Muni buses” as an extremely urgent priority. 
  • Respondents answering the Community survey in Chinese had the strongest concern about safety. 58% of Chinese speakers consider Muni unsafe from crime, almost a full 20% higher than respondents to the survey in English. 
  • The safety of our customers and staff is a top priority for the SFMTA. We have increased the number of staff riding Muni as a visual deterrent to crime. 
  • We will continue our efforts to make sure all Muni riders are safe and can be confident riding our buses and trains and will update you with our progress.   

Several passengers are seen boarding a train in a subway. An overheard sign is above with lights.

Increasing Reliability through Repairing and Upgrading our System 

  •  A top priority of respondents is “Repairing and maintaining Muni equipment and facilities to ensure vehicles’ safety, frequency and reliability,” and our commitment to timely repair and maintenance work is in line with that.  
  • Improving Real-Time Communications  
  • Riders would like more reliable real-time communications to help with trip planning.  
  • Improvements to the customer experience can be seen through the ongoing implementation of our new Next Generation Customer Information System.  

Far shot a bus approaching a bus shelter. There are people sitting and standing.

Respondents Understand the Need for Additional Public Transportation Funding  

  • Finally, a key takeaway from the Community Survey is that respondents want a better and more reliable public transportation system and recognize the need for additional funding to accomplish our shared vision and goals.  
  • Respondents support investing in Muni service as well as expanding safe bike and pedestrian pathways to ensure everyone in the city can access jobs and get where they need to go easily, regardless of their income or neighborhood.  

We agree that an affordable, reliable and safe public transit system is a critical part of a thriving and equitable community. We are committed to working toward this goal and thank our frontline staff for working so hard to improve service. 



Published May 05, 2023 at 02:11AM
https://ift.tt/LO9D1SZ

Rabu, 03 Mei 2023

Traffic Collisions have Decreased on San Francisco’s Slow Streets

Traffic Collisions have Decreased on San Francisco’s Slow Streets
By Julia Malmo

 Close up image of a street sign with the words "Slow Streets." Under white figurine wheel users and pedestrians are seen. There is a bicyclist in the background

As a whole, Slow Streets are safer than they were before being designated Slow Streets 

Streets that are part of the SFMTA’s Slow Streets Program have become measurably safer since the program began in 2020, with the number of traffic crashes falling by almost half. On average, these corridors have seen a 48% drop in collisions following their designation as Slow Streets, compared with a 14% drop in collisions citywide over the same period. Slow Streets also are more welcoming for people who walk, bike and roll. Fewer than 1,000 vehicles per day use all but four of the current Slow Streets (20th Street, Minnesota Street, Noe Street, and Page Street). 

The goal of the program is to create safe, shared streets that are comfortable and enjoyable for people of all ages and abilities, using any mode of transportation. We now can see how it’s doing in a new evaluation report.

When the SFMTA Board approved the permanent Slow Streets Program in December 2022, the Directors required that every Slow Street meet certain safety and comfort targets: average vehicle speeds of less than 15 miles per hour (MPH) and average daily vehicle volumes lower than 1,000. The Slow Streets team has been collecting between January 2023 and April 2023 to understand how the streets are performing. We placed pneumatic tubes every four blocks along Slow Street corridors in January of this year to collect vehicle volume and speed from 16 of the 18 streets currently in the program (Cayuga Avenue and 22nd Street were not included in the analysis because they are not yet implemented).  

Not only is traffic volume down, but all the Slow Streets have median speeds of 20 MPH or slower. However, most have not met the 15 MPH target set by the Board. This means that traffic still is not moving slowly enough for our most vulnerable road users to feel safe. 

 The Slow Streets team will begin working on these changes now with updated designs expected by this summer. 

Here is the 2023 Slow Streets Design Toolkit  (SFMTA.com/SlowStreetsToolkit) including details on the methodology used in the evaluation, along with individual corridor findings. To learn more about next steps, Signup for Email and SMS Alerts from the Slow Streets Program (SFMTA.com/SlowStreets) and individual corridors. We look forward to sharing more about how this data will inform next steps for Slow Streets designs across San Francisco! 



Published May 03, 2023 at 01:33AM
https://ift.tt/BepuXa1

Selasa, 02 Mei 2023

Three Golden Rules to Improve Scooter Safety

Three Golden Rules to Improve Scooter Safety
By Mona Chiu

The SFMTA has some exciting news for all who use the sidewalk in the city! Starting May 1, 2023, we'll be launching a new safety campaign to promote safe and responsible electric scooter use for both permitted scooter share devices and privately operated scooters. The campaign will focus on three key safety rules that every rider should keep in mind while riding: no sidewalk riding, no speeding and no double riding (two people riding one device). By educating riders about the dangers of sidewalk riding, unsafe speeding and riding, and improper parking, we hope to make the city safer for everyone.    

Animation images of cartoon animals riding a scooter. There are two images side by side. The left image shows a rabbit riding a scooter on the sidewalk with a turtle falling and a rhinoceros standing. The right image shows the same rabbit on a stationery scooter with the turtle and rhinoceros standing and smiling.

Sidewalk riding has been a major concern for pedestrians in San Francisco, and it's illegal to ride an electric scooter on the sidewalk.   

Animated image of a cat, turtle and rabbit on a scooter with a bear holding up their hand attempting to the stop the riders.

 Electric scooters can travel at speeds of up to 15 miles per hour, which can be dangerous if riders aren't paying attention to their surroundings. The SFMTA's safety campaign will encourage riders to be mindful of their speed (riding over 15 miles per hour is illegal) and to obey traffic laws. 

The campaign will also focus on emphasizing double riding is illegal. By law, only one rider should ride a scooter at a time.  

Animated image of a rabbit on the scooter with a bottle. They are confused and distraught.

To spread the word about this safety campaign, we will be placing posters on Muni buses, displaying ads in Muni bus stops and running ads on social media. This should help us reach as many scooter riders as possible and encourage them to prioritize safety while riding. 

Three images showing the side of a bus, a station platform sign and a close up of a car car inside a bus.

The SFMTA already has been actively working to improve scooter safety in San Francisco. We have implemented several policies and regulations, including: 

  • Requiring permitted scooter companies to provide a lock-to system to keep parked scooters out of the accessible path of travel  
  • Requiring permitted scooter companies to develop and implement a plan for safe riding. These plans include rider training, in-app messages with safety messages and sidewalk detection technology on their devices.  
  • Encouraging scooter permittees to adopt an escalating penalty structure for improper riding and parking 
  • Working with the Port of San Francisco to reduce sidewalk riding on the Embarcadero.  

The agency has also worked to improve infrastructure for scooter riders. We have installed: 

  • 3,000+ racks installed since the beginning of scooter permit program in 2018 
  • 11,000+ bike racks available citywide for scooter parking  
  • 465 miles of bikeways in San Francisco 
  • 78 miles off-street paths 
  • 139 miles of bike lanes (Class II) 
  • 43 miles of separated bikeways (Class IV)  
  • 45 miles of bike lanes and separated bikeways added since 2018 
  • 33 miles of Slow Streets 

The agency is also working to expand the active transportation network in the city through our new Active Communities Plan. 

If you want to report any complaints related to scooter riding, you can call 311 or visit the 311 website.  

To learn more about what the SFMTA is doing to promote a safe and useful scooter share system, visit our scooter share permit project page and view our data dashboards. 



Published May 01, 2023 at 11:32PM
https://ift.tt/x023aEC

Kamis, 27 April 2023

Track Work Through the Years

Track Work Through the Years
By Jeremy Menzies

San Francisco’s unique rail system brings together 150-year-old cable cars, historic electric streetcars of all shapes and sizes and modern light rail vehicles.  

Many trades across the SFMTA play a critical role in keeping the system moving. This month we look back in time at the work of one such group, the Track Department. While the lines and technologies of SF’s street railway have changed over the years, some of the base-level work, tools and skills needed to maintain our tracks are the same today as they were over 100 years ago. 

A decade before Muni was founded, the United Railroads Company (URR) dominated San Francisco’s transit system. URR owned and operated nearly 400 miles of street and cable car track all over the city. To keep this network in service, their track department was fully equipped to handle any possible construction or repair job. 

Black and white photo of group of people moving section of tracks with cranes

All hands were on deck for this job outside the Ferry Building in 1912. Here, two special work streetcars equipped with cranes lift an entire section of track in one piece. 

The Municipal Railway was built in 1912 and expanded over the next 16 years to include multiple lines and two dedicated tunnels. The city relied on its own team to maintain this system on a daily basis.  

Following World War II, many streetcar lines were converted to bus routes, but Muni retained the J, K, L, M, and N streetcar lines. With those core lines still in service, the work of the Track Dept. continued. 

Black and white photo of two people working on tracks. One holds a rail spike while the other strikes it with a large hammer

Taken on January 31, 1947, this photo shows Muni track workers Pat Kellerher and Con Maloney at Division and Bryant Streets.

In the 1970s, construction of the Market Street Subway transformed the city’s streetcar lines into the Muni Metro system. Miles of tracks were rebuilt to handle light rail vehicle (LRV) traffic, and an automatic train control system was introduced for subway operations.

Group of people working on tracks, one pushes a rail while the other lifts a tie into place

In this 1977 shot, a crew replaces K Line tracks on Ocean Avenue just outside Lick-Wilmerding High School.

Today the SFMTA Track Department is primarily responsible for maintaining and repairing our rail infrastructure. Outside of this, they take on other jobs moving cable cars to and from the cable car carpentry shop, hauling heavy equipment in the subway, and supporting the work of the teams that maintain and repair our stations. With the skilled labor, know-how, and equipment to do a variety of heavy jobs, the department plays a critical role in keeping Muni moving.

Photo of group of people lifting rail with a jack and pry bars

Whether it’s 1903 or 2023, track work is a team effort. This photo was taken during the March 2023 Fix-It Week when the Track team replaced sections of rail in the Van Ness Crossover.



Published April 27, 2023 at 05:23AM
https://ift.tt/pQYm1wO

Rabu, 26 April 2023

SFMTA Retires the Orion, First Hybrid Bus in Cleanest Transit Fleet

SFMTA Retires the Orion, First Hybrid Bus in Cleanest Transit Fleet
By Clive Tsuma

39 Coit Muni bus stopped on the street in front of Coit Tower.

San Francisco’s first low-emissions electric hybrid Orion bus

Muni’s Orion hybrid buses are headed for retirement as we phase in a brand-new batch of El Dorado hybrid electric buses. It’s the end of an era for San Francisco’s first low-emissions electric hybrid fleet that travels the city’s toughest routes.

Orion hybrid fleet tackles Muni’s toughest routes starting in 2007

The Orion buses have been a testament to the SFMTA’s commitment to the latest green transportation technologies. Muni, which previously had relied on a diesel bus fleet in coordination with our electric trolley bus fleet, transitioned to its first 30-foot Orion diesel hybrid-electric buses in 2007. This was the start of the SFMTA’s addition of these lower emission vehicles to one of the greenest fleets in the country, ensuring better air quality city wide.

The Orions brought the agency closer to achieving its goal of an all-electric fleet and a carbon-neutral San Francisco by 2040. This is consistent with San Francisco’s Climate Action Plan to dramatically reduce harmful emissions in communities. 

The Orions’ pint size made them ideal for winding routes like the 36 Teresita, which weaves through Twin Peaks, Diamond Heights, Glen Park and Bernal Heights. Many riders have taken Orions on their adventures along San Francisco’s curving streets, steep hills and tight turns. One can only imagine their sentimental value, especially among those who frequent the 36, as well as the 35 Eureka, 37 Corbett, 39 Coit and 56 Rutland routes.

The Orions were among the first low-floor hybrid buses to serve San Francisco, and the first with closed-circuit security cameras to help keep Muni riders safe. Their interior was fitted with internal destination signs to help customers know when their stop was approaching. The 30-foot coaches were designed to accommodate easier boarding and provide quieter, more efficient operation.

Their arrival offered us an opportunity to train Muni mechanics on hybrid vehicle maintenance. The agency continued to maintain the fleet even after the Orions’ assembly manufacturer went under in 2012.

The new El Dorados are primed to fill the gap left by their predecessors. Like the Orions, they are low-floor buses with a short wheelbase, making them ideal for navigating San Francisco. 

As their taillights fade into the horizon, the Orion hybrid bus fleet takes a much-deserved place in the history of San Francisco transit. They conquered the winding hills of Glen Park and navigated the twisting turns of Telegraph Hill. They will be remembered as the first of Muni’s fleet to pioneer hybrid batteries, moving Muni closer to a zero emissions future.  



Published April 26, 2023 at 01:30AM
https://ift.tt/gDuXIQ9

Jumat, 21 April 2023

Muni Improvements Draw Increased Ridership

Muni Improvements Draw Increased Ridership
By Kate McCarthy

Buses driving towards downtown on Geary Boulevard.

38 Geary buses zip downtown on new transit lanes that improve travel times for Muni riders.

As Earth Day approaches and we think about how to encourage more people to take non-car trips, recent Muni improvement projects are drawing increased ridership across the city. While Muni ridership downtown has not yet rebounded to pre-pandemic levels, ridership has gone up on Muni lines where we have improved speed and frequency of Muni service. 

Muni is a lifeline for many of our riders: 70% of Muni riders have an annual income of less than $50,000. As we restored and added Muni service after the start of the pandemic, we invested in the routes that serve people who rely on transit and need it most. For example, after we installed transit lanes, increased frequency and re-routed the 22 Fillmore to bring people to their jobs and medical appointments in Mission Bay, ridership increased to 107% of pre-pandemic levels on weekdays and 118% on weekends. 

Since the start of the pandemic, we’ve implemented more than 21 miles of new transit priority lanes, growing our transit lane network (https://ift.tt/J0IRYb8) to over 70 miles. These transit lanes are improving travel times for Muni riders across the city. After transit lanes were installed on Mission Street in downtown, travel times on the 14 Mission and 14R Mission Rapid are now 31% quicker. 

Ridership numbers on the 49 Van Ness-Mission also blossomed to 109% of pre-pandemic ridership on weekdays and 114% on weekends after construction on the Van Ness BRT corridor was completed last April. With physically-separated transit lanes and transit signal priority that gives the green light to Muni and Golden Gate Transit buses, riders there are seeing travel times reduced by 35%. 

A similar story has emerged on San Francisco’s busiest transit boulevard — Geary. Like other lines that serve downtown, the 38 Geary hasn’t fully recovered to pre-pandemic ridership levels. But the route did nab a spot in the top 10 highest recovered routes in the Muni system. The 38 Geary’s 36,000 daily riders have recently seen travel time savings of up to 18% since we installed three miles of new transit lanes, bus stop changes and other improvements as part of the Geary Rapid Project. We plan similar improvements on the western end of the corridor as part of the Geary Boulevard Improvement Project.     

Muni riders have noticed that improvements to our busiest Muni lines are making service faster and more reliable than it has been in decades. Two-thirds (66%) of Muni riders who took our Annual Muni Rider Survey last fall rated Muni service as “good” or “excellent” — a 9% increase from 2021 and the strongest increase since 2018. 

These improvements can’t come soon enough. Most of San Francisco’s greenhouse gas emissions come from cars and trucks. As the urgency to address climate change mounts, so does the need to get the most out of our Muni system. To inspire riders to come back to Muni, we’re working hard to bring back the Muni system our city deserves: One that is thriving with the better frequency, improved reliability and better connections that these projects are delivering. 



Published April 21, 2023 at 03:54AM
https://ift.tt/r75D2lX

Jumat, 31 Maret 2023

The Municipal Railway Planning Division & The First 5-Year Plan

The Municipal Railway Planning Division & The First 5-Year Plan
By Kelley Trahan

The San Francisco Municipal Railway 5-Year Plan, 1979-1984 was the first comprehensive service plan created by the first San Francisco Municipal Railway transportation planners. The plan introduced a grid system to provide more efficient crosstown service with better neighborhood connections that would improve access and increase ridership, moving away from Muni’s prior service design focused on trips to and from downtown. It also provided service standards, including coverage, capacity and stop spacing, many of which continue to inform Muni planning efforts today. The San Francisco Municipal Railway saw many changes at this time, including the opening of the Muni Metro, the conversion of some lines from diesel to electric trolley bus, a simplified fare structure and increased fares and historic streetcar service on Market Street. 

Prior to the mid-1970s, the San Francisco Municipal Railway’s service development was determined by a mix of privately-operated transit systems it had acquired, rather than one master transit plan. This changed when the federal government required the agency to submit a 5-year plan to be eligible for funding.  

The entire process began when President Lyndon B. Johnson signed the Urban Mass Transportation Act of 1964 into law in response to the nation’s long-term transportation investment needs. The new law provided grant and loan money to local transportation systems and created an oversight agency, the Urban Mass Transportation Administration (UMTA), which would be renamed the Federal Transit Administration (FTA) in 1991. The Metropolitan Transportation Commission (MTC) then was put together by the California State Legislature in 1970 and tasked with reviewing transportation grant applications submitted by agencies in the state. 

Text of documentation with signatures towards the bottom of the page with time stamped notation of 1964

 

Text of documentation with signatures towards the bottom of the page with time stamped notation of 1964

Urban Mass Transportation Act of 1964, Public Law 88-365, 78 STAT 302

An in-depth study of Muni was undertaken in 1974 by Wilbur Smith & Associates, a private consultant and author of the UMTA’s Characteristics of Urban Transportation Demand: A Handbook for Transportation Planners. The Municipal Railway Planning, Operations and Marketing (POM) Study was completed in 1977 and analyzed the Muni system and the travel needs of its riders and made recommendations for a 5-Year Plan. 

 A new in-house Muni Planning Division that had been created with UMTA funding in 1974 presented the POM Study at more than 70 community meetings, and after intense review and several revisions, The San Francisco Municipal Railway 5-Year Plan, 1979-1984 was drafted. 

A dozen people dressed in business casual posting for a group photo in front of a bus in what seems to be a bus yard. They are positioned in several different tiers.

Muni Planning Division Employees in Presidio Trolley Coach Yard, May 17, 1979

Since that first plan was written, transportation planning at the SFMTA has expanded to include capital projects, street design, bike lanes, paratransit, parking, historic streetcars and much more, while promoting safety, equity and sustainability. The SFMTA continues to publish an operating and service plan approximately every 10 years, now called the Short-Range Transit Plan (SRTP), which is based on the needs, goals and agency priorities to serve the people of San Francisco. 



Published March 31, 2023 at 01:26AM
https://ift.tt/trIEkMQ

Rabu, 22 Maret 2023

A Decade of Rolling out the Red Carpet for Riders

A Decade of Rolling out the Red Carpet for Riders
By Cassie Halls

 A map showing the expansion of transit lanes in San Francisco from 2103 to 2023, as well as lanes that are coming soon. A summary of key highlights from the map is included in the following link.

An animated map showing the expansion of red transit lanes in San Francisco. View as a PDF. Accessible version of the expansion of red transit lanes: 

Red Transit Lanes Over Time in San Francisco from 2013 to 2023 

There is nothing quite like looking out the window at gridlock traffic while your bus coasts down a red transit lane. This may feel like an “only in San Francisco” pleasure – after all, San Francisco was one of the first U.S. cities to “roll out the red carpet” by painting bus lanes red. But red transit lanes have now become a popular way to keep buses out of traffic in more than 25 cities across the country. 

The SFMTA is celebrating a decade since the installation of San Francisco’s first red transit lane on Church Street on March 23, 2013. You can help us celebrate by riding that first red transit lane between Duboce and 16th Streets on Muni’s 22 Fillmore and J Church along with thousands of other weekday riders. As you whiz past traffic, you may feel the estimated 14% time savings afforded by the red color.  

If you drive, help us celebrate by keeping transit lanes clear. Remember, double parking in transit lanes is camera enforced. Transit lanes are an essential tool to keep Muni moving on San Francisco’s busy streets.  

Dedicated transit lanes started popping up in the city as early as the 1970s following the adoption of the city’s Transit-First Policy (which happens to be turning 50 this month). As of 2023, over 20 lane miles of transit lanes now also have the red treatment, in addition to 55 miles of transit and bus/HOV lanes without red paint.  

J Church using red transit lanes and picking up passengers on a boarding island on Church at Market Street.

J Church train using red transit lanes on Church at Market Street. 

Although often the most visible, transit lanes are one of more than 20 tools in our toolbox to improve transit reliability and reduce delays. With Muni Forward, we’ve built more than 80 miles of transit corridor reliability improvements to keep Muni moving — with upgrades like bus bulbs for faster boarding and traffic signals that stay green for transit.  

As an early adopter of red transit lanes, the SFMTA helped lay the groundwork to change federal guidelines to make it easier to paint lanes red. This is because red colorization has led to a 55% improvement in motorist compliance and is a cost-effective way to reduce delays. We have to say they’re looking great for their age! 

We know that despite our best efforts, Muni buses and trains are sometimes stuck in traffic and transit lanes are occasionally blocked. That is why we continue to innovate to bring improvements to our riders. Last year we colorized six miles of transit lanes in the Van Ness Improvement Project, Geary Boulevard Improvement Project, and along Mission Street in SoMa, 4th Street and Stockton Street. We also continue to install Muni Forward transit priority projects across the city and push for further compliance improvements through an education campaign for motorists. The SFMTA was also recently awarded a state grant to deploy new next-generation camera technology as a part of the transit lane enforcement program. 

Stay tuned for more red transit lanes and other reliability improvements in the year ahead.  



Published March 22, 2023 at 03:35AM
https://ift.tt/teCnYNw

Sabtu, 18 Maret 2023

San Francisco’s Transit-First Policy Turns 50

San Francisco’s Transit-First Policy Turns 50
By Michael Delia

Two buses, a bicyclist, a pedestrian and person riding a scooter all on Market Street.

Transit on Market Street in downtown San Francisco, 2018

It’s been a half-century since the San Francisco Board of Supervisors put transit needs above all other traffic initiatives, and now, the city’s Transit-First policy is celebrating its golden anniversary. The policy guides the city’s work on major infrastructure projects and planning efforts. Its principles drive San Francisco officials to promote incentives that reduce traffic congestion and solo vehicle trips, support transit investments including the purchase of Muni buses and light rail vehicles, and regularly evaluate how well our transportation network functions. 

Adopted on March 19, 1973, the original Transit-First policy was born out of an effort to reshape the Municipal Railway so it could serve San Franciscans' needs more effectively. The goals were very specific: 

  • Create exclusive bus lanes and prohibit automobiles from streetcar and cable car tracks. 
  • Restrict turning movements of automobiles that conflicted with transit vehicles. 
  • Extend sidewalks at transit stops to allow boarding from the travel lane.  
  • Strictly enforce parking codes and tow-away regulations along major transit corridors. 
  • Consider the use of preemptive traffic signals for transit vehicles. 

By the early 70s, San Francisco streets had become increasingly crowded. The Freeway Revolt just over a decade earlier led to the cancellation of planned highway construction in the city, and an office boom downtown was bringing in thousands of commuters. Meanwhile, the San Francisco Bay Area Urban Renewal Association (SPUR) began a comprehensive review of Muni’s operations in 1972. The organization interviewed operators and management, conducted line checks and reviewed company properties and processes to identify areas for improvement. 

“The recurring theme was most Muni vehicles were operating in traffic. This was the source of many problems — schedule bunching, accidents, unhappy operators and riders,” said Jim Chappell, executive director of SPUR from 1994-2009. 

The recommendations in SPUR’s report, “Building a New Muni,” were well-received by the mayor and city supervisors, and the Transit-First policy was passed not long after its release. Transit-First also addressed concerns about increased air pollution and environmental damage by effectively putting the personal automobile on notice. 

Cable car tracks with the words “keep out” painted over the street.

Transit-only lane along the Powell Street cable car tracks from California to Pine Street | November 27, 1973 

New equipment, transit priority and a focus on complete funding for Muni were initial hallmarks of the policy. The passage of Proposition E, a city charter amendment, in 1999 further enhanced Transit-First by including protections in the landmark legislation for people walking and bicycling. 

“San Francisco’s Board of Supervisors showed remarkable foresight in adopting the Transit-First resolution, and it no doubt helped San Francisco remain one of the strongest public transit cities in the nation,” said Jason Henderson, San Francisco State University Geography and Environment professor and author of Street Fight: The Politics of Mobility in San Francisco.  

In addition to making transit, walking and biking more attractive, Transit-First also promotes equity. When residents have options beyond cars, employment and economic opportunity can grow, as does the opportunity to reduce greenhouse gases. 

Professor Henderson believes San Francisco was the first city in the country to adopt a policy to prioritize public transit, but that doesn’t mean the work is done. “Transit-First must no longer be advisory,” he said. “[New policies are] needed so that public transit, cycling and walking are more than aspirational.”   

In recent years, the “Muni Forward” program has reflected the Transit-First policy with 80 miles of transit priority street improvements. Among those improvements, diamond-marked transit lanes have evolved to become the present-day “Red Carpet” lanes reserved exclusively for buses and taxis to reduce travel times and the impact of traffic congestion on Muni schedules. Meanwhile, Market Street has gone through various redesigns in the downtown area over the years. Following boarding island and lane improvements, San Francisco’s busiest thoroughfare received its first red transit lanes in 2014 and was declared “Car Free” in a monumental celebration on January 29, 2020. 

Three people board a Muni bus on Van Ness Avenue in front of City Hall.

Riders board a 49 Van Ness/Mission bus near City Hall 

Today we can see the Transit-First policy in action in the now open Central Subway and projects such as the Van Ness Bus Rapid Transit (BRT) corridor and the Muni Forward L Taraval Improvement Project that is now under construction to add transit lanes, make the route more accessible and improve pedestrian safety and visibility. With Transit-First entering its 51st year, there are new challenges as the COVID-19 pandemic has driven many people back into private cars. However, the SFMTA’s improvement projects continue with a focus on proven strategies that make transit, walking and bicycling the city’s preferred modes of travel. 



Published March 18, 2023 at 01:12AM
https://ift.tt/Sh721dV

Jumat, 17 Maret 2023

Reimagining Potrero Yard – A Community Open House, Saturday, March 18

Reimagining Potrero Yard – A Community Open House, Saturday, March 18
By John Angelico

A rendered image of a modern multi-use building is seen from the street level intersection of 17th and Hampshire streets. At the corner, a retail establishment is seen. The first two levels of the building show industrial construction elements. Above those levels, housing units are seen along with greenery and trees. Pedestrians are seen on the sidewalk, a cyclist is seen in a bike lane, and vehicles are on the street.

This conceptual rendering shows one of the proposed spaces in the Potrero Yard project designated for small businesses and non-profits at the intersection of 17th and Hampshire streets. (Image: Arcadis IBI Group) 

This Saturday we’re joining the Potrero Neighborhood Collective (PNC) developer team to host a community open house for the Potrero Yard Modernization Project, the nation’s first joint development of a bus facility with integrated housing and retail. Learn about how we’re improving transit by replacing a century-old bus yard with a modern facility, as well as addressing SF’s need for affordable housing. Please join us to view the latest designs and give your input on this groundbreaking project.  

A rendered image of a modern multi-use building is seen from street level. There are trees on the street and signage is visible on the sidewalk in front of the building showing the Muni and SFMTA logos. Pedestrians are seen on the sidewalk, a vehicle is on the street and a Muni bus is seen in the background. The image is labeled in English and Spanish: Reimaging Potrero Yard; Reimagina el Potrero Yard.

Join us! Reimaging Potrero Yard. Saturday, March 18,  2023, 1-3 p.m. KQED, 2601 Mariposa Street, SF. (Conceptual rendering from Arcadis IBI Group)

What: Reimagining Potrero Yard Community Open House

Español - Reimagina el Potrero Yard. Sábado 18 de marzo, 1-3p.m. KQED, 2601 Calle Mariposa, San Francisco CA

When: Saturday, March 18, 1-3 p.m. 

Where: KQED building, 2601 Mariposa Street, San Francisco, CA 94110 

This event will be family-friendly with activities for all ages. Take a tour of Potrero Yard to get an inside look at this 108-year-old facility and check out the historic Muni bus we’ll have parked outside. Childcare and lunch will be provided.  

Safety note: Closed-toed shoes required, and no strollers allowed on the tour. 

For interpretation or other accommodations, please contact PotreroYard@plenarygroup.com or 415-646-2223 at least 48 hours before the event. 

Topics we need community input on include: 

  • Streetscape on 17th Street: What type of amenities and activities would you like to see on 17th Street to create a welcoming environment? 

  • Spaces for small businesses & non-profits: What kind of neighborhood organizations or businesses would you visit? What type of street vendors would you like to see? 

  • Landscaping choices along sidewalks: Creative landscaping can greatly improve the vibrancy and safety of spaces. We want your ideas — including which tree species you’d like to see.  

  • Look and feel of the building: Do you have ideas on building materials? Let us know what colors, textures and artistic elements you’d like to see on the new structure.  

  • Public art: Art in the public realm can enliven spaces and capture the essence of unique neighborhood characteristics. The project’s Public Art strategy will be developed with input from the community. Learn more at our upcoming informational presentation to the SF Arts Commission Civic Design Review Committee on Monday, March 20. 

At the end of 2022, we selected the Potrero Neighborhood Collective to partner with the city and launch the current predevelopment agreement phase. This period lasts roughly 18 months. The Potrero Yard Modernization Project has always considered transparency and open dialogue to be key as we partner with the community to bring this project forward. The project would not be where it is today without that community partnership. This open house is an opportunity to help shape the project’s design before we break ground in 2024. 

To learn more, visit the Potrero Yard Modernization Project (SFMTA.com/PotreroYard).



Published March 17, 2023 at 05:25AM
https://ift.tt/OVmQwbg

Selasa, 14 Maret 2023

Tech Talk: Muni Predictions 101

Tech Talk: Muni Predictions 101
By Christopher Ward

A picture containing contractors speaking with a Muni Rider as customer information displays are being installed in a transit shelter. New Customer Information Systems are being installed and causing customer curiosity! 

Got a burning question about the SFMTA’s Muni predictions that are made by our Next Generation Customer Information System (CIS)? We’ve got answers! Below are some of the frequently asked questions from Muni customers. Send us yours! 

Where do Muni predictions come from?  

Muni predictions come from data provided by multiple SFMTA systems including equipment on our vehicles. Real-time predictions are based on the real-time locations of Muni vehicles. A computer algorithm compares the real-time data to past travel times based on time of day, day of week, season and other factors that affect travel to predict future arrival times. Travel patterns in this historic data are applied to real-time data to generate accurate Muni predictions. 

When the system has no real-time information, it uses Muni schedules to make predictions. This often occurs at or near terminals and during service changes. However, schedule data isn’t as reliable as real-time data, particularly because the SFMTA has made Muni service more reliable by shifting away from using schedules to headway management, scheduling service at regularly spaced intervals to reduce gaps and bunching, rather than clock times. 

What factors impact predictions? 

The two main problems with predictions are 1) vehicles in service but not showing up in the Customer Information System (we call those “surprise vehicles”) and 2) predictions made from the schedule, but the vehicle doesn't show up (we call those “ghost vehicles”).  

A “surprise vehicle” is when a bus or train is running but it is not picked up by the real-time position data feed. This may be because of damaged equipment, a vehicle not signed into the system when it departs the division, or when changes are not entered into the system. When a vehicle is missing from the system, the wait times at stops appear longer than they actually will be. This happens because the prediction system does not “see” one of the vehicles. 

A “ghost vehicle” usually occurs at stops close to the start of the line. You might see this at the stop when looking at the prediction countdown. When the count gets to zero, no vehicle appears! This happens because the prediction system is not picking up any vehicles while they are at the terminal and before they start the route. This results in the countdown relying on the schedule, even if the vehicle is delayed. If a vehicle is scheduled but not coming, then the countdown will end and there will be no vehicle. The system relies on the vehicle data when it is available, otherwise it will show the schedule information that may not be accurate.  

The same problem occurs with trains as with buses but at an increased rate, because trains cannot pass each other like buses. Because of this, there are often service adjustments made at the control center to manage gaps that result in inaccurate predictions. 

Why do different apps have different predictions sometimes? 

The SFMTA generates vehicle information and shares this data openly for anyone to use cost-free. Third party apps like Transit, Google and Waze, as well as “mom and pop” apps, each have their own way of taking in and making use of the data that we provide. 

These third parties are independent of the SFMTA and we do not keep track of the quality of their predictions. If customers experience problems, we recommend reporting the problem directly to the third-party and checking the predictions at SFMTA.com/Routes. 

What does it mean when a Muni display says, “no predictions available?”  

The “no predictions” message displays when there is no real-time vehicle data to generate predictions, either because the system is down or a vehicle is not logged into the system. This does not mean that isn’t service. Buses and trains are still running. If there is a service issue affecting bus or train operation, the SFMTA will display relevant information, make audio announcements, send out email and SMS alerts and post on Twitter.    

What new features will be added and how can I learn more?  

The Next Generation CIS screens now display real-time vehicle locations on a map and real-time on-board vehicle capacity information, along with arrival prediction times. 

Some of the next features we plan to roll out are real-time alerts such as reroutes and elevator availability. We’re also improving terminal predictions, and we are working on multiple MuniMobile app upgrades.  

For more information visit our CIS project and System Updates websites! 



Published March 13, 2023 at 11:57PM
https://ift.tt/kbzOgSZ

Kamis, 09 Maret 2023

Muni Safe Driver Awards 2023

Muni Safe Driver Awards 2023
By Sophia Scherr

Title: "Muni Safe Driver Awards - Class of 2023! Highlighting Safe Drivers Francisco A. (22 years), Sharon A. (24 years) and Rafael C. (33 years). Text below: "Congratulations to our incredible Muni Safe Driver Awardees! Earning this achievement is a hard-earned career milestone. Next time you ride don't forget to thank your operator!" Muni logo

Keep an eye out for one of our Safe Driver Award PSA’s on your next Muni ride & don’t forget to thank your operator! 

Driving through San Francisco’s winding and hilly terrain in any vehicle is tricky. Doing so in a 40-foot bus, cable car or streetcar is not as easy as our operators make it seem. Despite these challenges, every day our Muni operators connect San Franciscans to where they need to go safely.  

This Saturday marks the 50th Safe Driver Awards, where we celebrate our transit operators who have put safety first in their efforts to deliver you to your home, work and communities. This year 249 operators earned the distinction of being a Muni Safe Driver. Receiving a Safe Driver award is a hard-earned career milestone — to achieve it, operators must have driven at least 1,952 hours during the past fiscal year (July – June) without a preventable incident or collision. Quite a few operators have maintained their Safe Driver status for several decades. Now that’s a dedication we applaud! 

This Saturday, we’ll recognize the following operators for 35+ years of continued safe driving:  

  • Oliverio V. – 48 years (Cable Car) 

  • Lonnie M. – 45 years (Green Division) 

  • Jason L. – 38 years (Green Division) 

  • Eddie C. – 35 years (Cable Car) 

  • Andrew M. – 35 years (Cable Car) 

“I can’t thank our operators enough. They show up to work every day with a commitment to keeping our riders safe. Those recognized at the Safe Drivers Awards ceremony display extraordinarily safe driving track records,” said Jeffrey Tumlin, Director of Transportation. “All our operators have worked throughout the pandemic and in very difficult driving conditions or challenging environments with safety as their top priority. They are the heroes that positively represent our agency daily and deserve the utmost praise for their service!”  

The SFMTA and our city rely on our Muni operators to keep the city moving by providing daily service to hundreds of thousands of riders throughout the Muni network. We not only honor these incredible 249 operators, but all the employees who work hard to make safety the standard by which we operate. Next time you ride, don't forget to thank your operator!  



Published March 09, 2023 at 01:19AM
https://ift.tt/b4zvhVk

Rabu, 01 Maret 2023

Black History Lost and Found: Dorothy Jaymes and Accessible Transit

Black History Lost and Found: Dorothy Jaymes and Accessible Transit
By Jeremy Menzies

We continue to celebrate Black History Month by sharing the stories of SFMTA staff whose revolutionary work helped pave the way for future generations of Muni riders. Today, we look at the incredible contributions of Dorothy Jaymes, who played a critical role in helping advance accessibility on transit in San Francisco at a time when little was being done.  

Employees standing in between shelving holding various items such as a umbrella, tennis racket and bicycles. The shelving is filled with additional various items.

Jaymes (left, holding tennis racket) with her assistant, Linda Westry in the Muni Lost & Found Department in 1977. 

Born in Lake Charles, Louisiana, Jaymes started her career in Muni’s Lost & Found Department in the 1970s. According to a 1977  article in the department newsletter, Trolley Topics, she took her job seriously, accounting for every lost item no matter how small or large. 

Around the same time, protests by local disability rights advocates exposed the issues of poor access to public transit to local officials. The city responded in part by seeking contracts for new buses with passenger lifts in 1978 and by establishing the Elderly & Handicapped Program, to which Jaymes was a foundational contributor. 

Group photo of employees. The back row of three staff is standing. The front row of three staff is seated. One emplyee is wearing a Muni work vest.

Members of Muni Elderly & Handicapped Office staff in 1985, with Jaymes at center. 

By October 1979, Jaymes headed up the E&H Office and was responsible for processing applications for discounted transit fare cards. An early version of the Free Muni for People with Disabilities Program, this program lowered the cost of transit for people who needed it most. 

Jaymes’ role in the office played a critical part in improving access to transit for all San Franciscans. 

Employee smiling and holding a vintage card camera

Working out of a room in the Muni Photo Department, Jaymes wields an ID card camera in this 1979 photo. 

She left Muni in 1990 and finished out her career with the City of San Francisco at the Planning Department, before retiring in the early 2000s. Jaymes returned to Louisiana in retirement and passed away in 2015 at age 89. One of her former San Francisco co-workers remembered her as “a wonderful woman who was strong and always stood up for the workers.” 

So often, we only hear the stories of major figures and their brave breakthroughs in history. Capturing the full story begins with also celebrating and recognizing the contributions of our “unsung heroes,” whose daily work is still helping Muni riders today.  



Published March 01, 2023 at 12:31AM
https://ift.tt/Q67reTS

Sabtu, 25 Februari 2023

N Judah Motorization Allows City Partners to Complete Critical Maintenance Work

N Judah Motorization Allows City Partners to Complete Critical Maintenance Work
By Jessie Liang

Crew member by the rail track and an excavator with a shovel along the street with houses lined along the side.

MOW Crew Repairing Damaged Pavement Around Tracks on 9th Avenue

Kudos to the SFMTA’s Maintenance of Way (MOW) teams for successfully completing critical work during the N Judah motorization on Feb. 18 and 19. The purpose of the motorization was to provide access for work to be done in Muni’s right of way by Public Works, PG&E and the SFMTA, including utility pole replacements at Cole and Carl, sewer investigation, repairs at 18th Avenue and Judah and 41st Avenue and Judah. The SFMTA was also making improvements to the J Church surface route between Duboce Park and the Balboa Park Station to increase service reliability, enhance street safety and reduce travel times. 

To maximize the benefits of the motorization, the MOW teams took advantage of the opportunity to complete project milestones and critical maintenance work  for traction power and overhead lines, mechanical systems, light rail track and signals. 

To ensure that our riders had the transit service they needed along this corridor, bus shuttles served as a substitute for N Judah rail service between Ocean Beach and Church and Duboce. Train service continued between Church and Duboce and Caltrain. The SFMTA’s communications team also helped to notify customers of the alternative service plan during the rail shutdown through printed, digital and audio messaging and wayfinding ambassadors.  

Muni maintenance initiatives such as these aim to make subway operations more reliable for customers and prevent future breakdowns. The coordination by our teams across divisions is building on the successful Fix It! Weeks we had last year, which have helped reduce major delays in the Muni Metro by more than 80 percent. We look forward to more to come at our first Fix It! Week scheduled for March 16 to 22.  

For updates, please visit SFMTA.com/NShuttle. For real time service advisories, please follow us on our Twitter at @SFMTA_Muni.  



Published February 25, 2023 at 08:25AM
https://ift.tt/u7ciMvH

Kamis, 16 Februari 2023

Scooter Permittees Receive Feedback from Students with Disabilities

Scooter Permittees Receive Feedback from Students with Disabilities
By Maddy Ruvolo

On a recent Monday in Golden Gate Park, 28 students and staff from AccessSFUSD gathered on JFK Drive to test-ride adaptive scooters. The group took turns riding adaptive devices from two scooter companies permitted to operate in the city, Lime and Spin. Adaptive devices are designed to meet the needs of riders with a variety of disabilities and provide additional stability features, such as a seat, a wider base, and an additional wheel. After trying the scooters, the students shared their feedback about a variety of design elements, including the wheels, seat, throttle, basket location, foot plate width, and the ease of getting started. 

A group of AccessSFUSD students and staff rides adaptive scooters on JFK Drive in Golden Gate Park Adaptive scooter demo in Golden Gate Park

Students embraced the opportunity to ride scooters and provide feedback. AccessSFUSD is a community-based program for students 18-22 with disabilities. Located across 11 sites in San Francisco, the program focuses on teaching functional life skills within the community setting. Developing advocacy skills is a key component of the program, and students enthusiastically shared their input with the scooter companies. Heidi Seretan, Special Education Department Head at AccessSFUSD: The Arc said, “It was a glorious day to ride and advocate on car-free JFK in Golden Gate Park, San Francisco’s own backyard.”  

One student shared they had an “amazing first time” riding a scooter and described it as “the best.” Students also gave thoughtful constructive criticism, explaining when a particular seat height or device design didn’t work for them. And one student said that they “need more practice... but I'm getting the hang of it.”   

AccessSFUSD students standing with Lime and Spin scooters; one student is giving a thumbs upThumbs up to adaptive devices

Staff from Spin and Lime were on-hand to help students get rolling and to answer any questions. Both scooter permittees expressed their appreciation for the comments from AccessSFUSD students. Lime shared that they “enjoyed hearing directly” from the students and that their “hardware team has already begun reviewing students’ feedback to find ways to continue to refine our vehicles.” Spin echoed the importance of the students’ input, noting that “the direct feedback we gather from local San Francisco students and residents on our adaptive program is critical to continuously improving and more equitably serving the entire community.” 

AccessSFUSD students on Lime and Spin scooters in Golden Gate ParkAccessSFUSD students enjoying scooters 

This is the second time the SFMTA has partnered with AccessSFUSD and scooter permittees to host an adaptive scooter demonstration, with the first event held in fall 2021. Any organization interested in partnering on a similar adaptive scooter event should get in touch with Maddy Ruvolo with our Accessible Services team by emailing Maddy.Ruvolo@sfmta.com.  

A group of AccessSFUSD students wearing helmetsStudents ready to ride

The SFMTA has prioritized adaptive scooters as part of our Powered Scooter Share Permit Program. The three scooter permittees — Bird, Spin and Lime — are required to provide adaptive scooters as a minimum of 5% of their on-street fleet. The permittees also offer different types of adaptive devices through their Complementary Adaptive Programs, which provide longer-term adaptive rentals free of charge through scheduled drop-off and pick-up. We encourage all who are interested to try an adaptive scooter, and stay tuned for more scooter demonstration events coming later this year! 



Published February 16, 2023 at 12:24AM
https://ift.tt/0AEmtuq

Rabu, 15 Februari 2023

New Express Service Comes to the 1 California

New Express Service Comes to the 1 California
By Melissa Culross

Photo showing a pole on the street painted yellow that says bus stop, 1, 1X

Newly painted Muni flag stop indicating the pilot 1X California Express

Beginning February 21, 2023, a pilot program will offer express bus service on the new 1X California Express between the Richmond neighborhood and the Financial District. The SFMTA plays a significant role in San Francisco’s economic recovery, and this pilot that serves downtown is part of that. 

We have been working on improving travel time and reliability over the last several years. Travel times are now 11% quicker on the 1 California thanks to new transit lanes on California, Clay and Sacramento streets. But our work is not done on the corridor! The new 1X California express will provide another option for riders to zoom from the inner Richmond into and out of downtown even faster. We also expect this service to ease crowding on the 1 California as more people head back to the office. 

Three morning 1X California Express buses will depart from 33rd Avenue and Geary Boulevard at 8:00 a.m., 8:30 a.m. and 9:00 a.m. They will make stops along 33rd Avenue, 32nd Avenue and California Street until Arguello Street, then express straight to Downtown.  

Three afternoon 1X California Express buses back to the Richmond will depart from Sacramento and Davis streets at 4:30 p.m., 5:00 p.m. and 5:30 p.m. They will make three downtown stops and then express straight to Arguello and California. The first two outbound stops of the 1X California Express have been aligned with 1 California local stops to improve convenience for Muni customers. The last downtown stop is at David and Pine streets.  

You can find more detailed service information on the 1X route page (SFMTA.com/1X). 

The SFMTA is monitoring this pilot and will evaluate whether to make it permanent based on the needs of our riders. Let us know what you think at the Muni Feedback page. 

We are excited about this opportunity to support the recovery of downtown San Francisco by offering people this swift way to get there. 



Published February 15, 2023 at 01:01AM
https://ift.tt/3yH5DVF